N.O.R.F;918853 wrote:
Concrete and steel reinforcement from about 2m below ground is required and that is expensive.
Waa la eegi.
it doesnt look like that, it looks like they have only removed the top layer(s), then lay on the asphalt,
it would be interesting to see built drawings from old design....